Final | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PASS |
Rock A. Hudson
|
|
|
Final on Garage 2. Contact Craig Timmons @ ###-#### or Bob Mott. Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
|
Final | 10/8/2015 | 10/8/2015 | 10/8/2015 | P | PART |
Daryl DeGrange
|
|
|
Bob gave temp ok 10/1/15 but no inspection is shown, contact Christina Phone #: ###-#### Partial final for temporary occupancy
|
Rough-In Permanent Service | 4/11/2014 | 4/11/2014 | 4/11/2014 | A | PASS |
Rock A. Hudson
|
|
|
Park in lay down yard on east side of Lysted road and I will escort to inspection. Thanks Phone #: ###-#### >> Inspection requested via web by Lonny Baum "G" wing, concrete encased, underground to tie in duct bank, Panel "G" stub out footing. Rough in ok cover
|
Electrical Rough-In | 3/12/2014 | 3/13/2014 | 3/13/2014 | A | PART |
Bob Reichert
|
|
|
Requesting an underground inspection. Contact Lonny Baum at the job site. Phone #: ###-#### >> Inspection requested via web by Tina Payne ok cover part u/g for garage 2, part e, f, g, near elevator and east center area
|