Final | 9/22/2014 | 9/23/2014 | 9/23/2014 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt Final ok
|
Final | 9/17/2014 | 9/17/2014 | 9/17/2014 | P | FAIL |
Bob Reichert
|
|
|
Call for access Phone #: ###-#### Inspection requested via web by John VanZandt called, kitchen gfci right of sink not working, outside panel schedule not complete
|
Electrical Rough-In | 8/29/2014 | 8/29/2014 | 8/29/2014 | P | PASS |
Daryl DeGrange
|
|
|
Insp on columns in basement Phone #: ###-#### Inspection requested via web by John VanZandt rough-in ok cover columns
|
Electrical Rough-In | 7/23/2014 | 7/24/2014 | 7/24/2014 | A | PASS |
Rock A. Hudson
|
|
|
Rough insp. On floor heat Mst bath, call for access Phone #: ###-#### >> Inspection requested via web by John VanZandt Rough in ok cover
|
Electrical Rough-In | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | PART |
Doug A Poedy
|
|
|
call 30 minutes prior Phone #: ###-#### >> Inspection requested via web by John VanZandt. Ok to cover. Basement has wood pillars getting put in after sheetrock that we need to look at.
|