Final | 8/11/2017 | 8/15/2017 | 8/15/2017 | P | PASS |
Tom Saunders
|
|
|
Clark Phone #: ###-####...
finaling this permit for basement remodel and upstairs bath fan addition....homeowner will open another permit for work to be done in garage...extending one circuit
|
Final | 1/4/2017 | 1/5/2017 | 1/5/2017 | P | CANC |
Tom Saunders
|
|
|
Clark Phone #: ###-####...
wrong inspection
|
Electrical Rough-In | 1/5/2017 | 1/5/2017 | 1/5/2017 | P | PASS |
Tom Saunders
|
|
|
Clark Phone #: ###-####...
upstairs bath fan added to light off same switch
|
ELE-Request for Extension | 1/3/2017 | 1/4/2017 | 1/3/2017 | P | PASS |
Tom Saunders
|
|
|
Clark Phone #: ###-####..
still under construction...extension ok
|
Conference | 12/27/2016 | 12/28/2016 | 12/28/2016 | P | PASS |
Tom Saunders
|
|
|
Clark Phone #: ###-####...
discussed using m/c in garage on surface to reconnect power to circuit...location of junction box....readily accessible....exhaust fan for upstairs bath installation...use of m/c to install motion light at front of garage
|
Final | 8/3/2016 | 8/4/2016 | 8/4/2016 | A | CANC |
James Ady
|
|
|
Clark Phone #: ###-#### needed rough in
|
Electrical Rough-In | 8/4/2016 | 8/4/2016 | 8/4/2016 | P | PASS |
James Ady
|
|
|
Clark Phone #: ###-#### Basement Interior walls ok to cover
|
ELE-Request for Extension | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | PASS |
Rock A. Hudson
|
|
|
Clark// please call before Phone #: ###-#### Still under construction. Extension OK
|
Electrical Rough-In | 8/5/2015 | 8/7/2015 | 8/7/2015 | A | NR |
Rock A. Hudson
|
|
|
Clark Phone #: ###-#### Turned into another conference. Discussed possible service upgrade to 200 amp and new panel location. Talked about work space, box fill, grounding of new service, dedicated microwave circuit.
|
Electrical Rough-In | 4/17/2015 | 4/20/2015 | 4/20/2015 | P | PART |
Rock A. Hudson
|
|
|
Clark// please call before Phone #: ###-#### Basement bath ro remain open until wiring is complete. Check plumbing bond reattached at water heater in basement. To replace fixture wire used to power light to garage from basement. Perimeter wall rough in ok cover
|
Conference | 3/24/2014 | 3/25/2014 | 3/25/2014 | A | DONE |
Daryl DeGrange
|
|
|
Clark-please call 30 mins prior to inspection Phone #: ###-#### Discussed with homeowner electricial requirements for basement remodel
|