Final | 4/29/2014 | 4/30/2014 | 4/30/2014 | A | PASS |
Daryl DeGrange
|
|
|
Treon Phone #: ###-#### final ok
|
Electrical Rough-In | 4/15/2014 | 4/15/2014 | 4/15/2014 | P | PASS |
Daryl DeGrange
|
|
|
Ceiling grid - Mike Phone #: ###-#### rough-in ok cover ceiling grid
|
Electrical Rough-In | 3/13/2014 | 3/13/2014 | 3/13/2014 | P | PASS |
Daryl DeGrange
|
|
|
Please provide a rough-in inspection of the walls at the Syringa Networks Lobby Remodel. For questions contact Max at ###-####. Thank you, and have a wonderful day! Phone #: ###-#### >> Inspection requested via web by Kevin Perez rough-in ok cover walls
|