Final | 5/16/2014 | 5/16/2014 | 5/16/2014 | P | PASS |
Daryl DeGrange
|
|
|
Jared Phone #: ###-#### final ok
|
Electrical Rough-In | 4/17/2014 | 4/17/2014 | 4/17/2014 | P | PASS |
Rock A. Hudson
|
|
|
late afternoon please - Jared Phone #: ###-#### Splice in LB on east side to be changed to junction box by final. Shop rough in ok cover
|
Electrical Rough-In | 3/31/2014 | 3/31/2014 | 3/31/2014 | P | PASS |
Daryl DeGrange
|
|
|
early as poss // trench // JR (father) Phone #: ###-#### rough-in ok cover trench house to shop
|
Conference | 3/27/2014 | 3/28/2014 | 3/28/2014 | A | DONE |
Daryl DeGrange
|
|
|
Jared Phone #: ###-#### Talked with homeowner about electrical requirements for dettached shop. Homeowner started wiring prior to conference
|