Final | 12/1/2014 | 12/1/2014 | 12/1/2014 | P | PASS |
Bob Reichert
|
|
|
call ahead to meet// allen Phone #: ###-#### ok final
|
Final | 11/17/2014 | 11/17/2014 | 11/17/2014 | P | FAIL |
Rex Boyles
|
|
|
Need a final for the addition and floor heat. Call Alan the homeowner @ ###-#### prior to arrival to gain entry. Phone #: ###-#### Inspection requested via web by John Edwards 210.8(1)-GFCI protection for all receptacles in bath. 210.12(B)-AFCI protection required in sleeping areas.
|
Electrical Rough-In | 10/28/2014 | 10/28/2014 | 10/28/2014 | P | PASS |
Rock A. Hudson
|
|
|
Need an ok to cover new walls. call Alan the home owner @###-#### prior to arrival to gain entry. Call Jimmy @ ###-#### for questions. Phone #: ###-#### Inspection requested via web by John Edwards Contractor to add bed bath, closet and floor heat to permit. Wall and ceiling rough in ok cover
|
Permanent Service | 4/17/2014 | 4/18/2014 | 4/18/2014 | A | PASS |
Bob Reichert
|
|
|
Call Jimmy 20 min prior to arrival for access. ###-#### Phone #: ###-#### >> Inspection requested via web by John Edwards p/s o/h rec ok
|