Final | 6/11/2014 | 6/12/2014 | 6/12/2014 | A | PASS |
Daryl DeGrange
|
|
|
Fixed issues with receptacles ready for final. Phone #: ###-#### >> Inspection requested via web by robert feller final ok
|
Final | 6/10/2014 | 6/11/2014 | 6/11/2014 | A | FAIL |
Rock A. Hudson
|
|
|
Just need final on this one Phone #: ###-#### >> Inspection requested via web by robert feller 210.8- receptical outlets located with in 6' of sink shall have GFCI protection. 110.7- Wiring shall be free of short circuits and grund faults. FT11 tripped when tested, open niutral on office receptical, FT7 dead.
|
Electrical Rough-In | 6/5/2014 | 6/6/2014 | 6/6/2014 | A | PASS |
Daryl DeGrange
|
|
|
Inspection to cover ceiling. Phone #: ###-#### >> Inspection requested via web by robert feller rough-in ok cover ceiling grid
|
Electrical Rough-In | 4/30/2014 | 4/30/2014 | 4/30/2014 | P | CANC |
Bob Reichert
|
|
|
Inspect new walls for cover. Job is in the Lynx Center Building call before you get there thanks. Phone #: ###-#### >> Inspection requested via web by robert feller ok cover walls only
|