Final | 11/6/2014 | 11/7/2014 | 11/7/2014 | A | PASS |
Bob Reichert
|
|
|
Julie Phone #: ###-#### ok final
|
ELE-Request for Extension | 10/21/2014 | 10/21/2014 | 10/21/2014 | P | PASS |
Bob Reichert
|
|
|
Doug Phone #: ###-#### called, left message, ok for extension
|
Electrical Rough-In | 10/6/2014 | 10/7/2014 | 10/7/2014 | A | PASS |
Bob Reichert
|
|
|
Doug Phone #: ###-#### ok cover bath
|
Electrical Rough-In | 9/19/2014 | 9/22/2014 | 9/22/2014 | A | PASS |
Daryl DeGrange
|
|
|
Doug Phone #: ###-#### correction done rough-in ok cover
|
Electrical Rough-In | 9/10/2014 | 9/11/2014 | 9/11/2014 | P | NR |
Bob Reichert
|
|
|
Doug Phone #: ###-#### met owner reviewed free length, stapling, make-up, 1 1/4", circuiting, gfci,
|
Permanent Service | 9/11/2014 | 9/11/2014 | 9/11/2014 | P | PASS |
Bob Reichert
|
|
|
Doug Phone #: ###-#### p/s u/g rec ok
|
Conference | 4/28/2014 | 4/29/2014 | 4/29/2014 | A | DONE |
Bob Reichert
|
|
|
early as poss // Douglas Phone #: ###-#### talked about service, sub-panels, get NEC to read, outlet spacing, inspections, make-up
|