Final | 7/7/2014 | 7/7/2014 | 7/7/2014 | P | PASS |
Rex Boyles
|
|
|
Levi. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy meeting room and corridor and bathrooms 2nd floor final ok
|
Electrical Rough-In | 6/17/2014 | 6/18/2014 | 6/18/2014 | P | PASS |
Rex Boyles
|
|
|
Levi. Ceiling cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Ballroom ceiling ok to cover
|
Electrical Rough-In | 5/27/2014 | 5/28/2014 | 5/28/2014 | A | PASS |
Rex Boyles
|
|
|
Levi. Hard lid cover inspection. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough in ceilings in 2nd floor meeting room ok to cover
|
Electrical Rough-In | 5/6/2014 | 5/6/2014 | 5/6/2014 | P | PASS |
Daryl DeGrange
|
|
|
Levi. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough-in ok cover walls 2nd floor meeting room
|