Final | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PASS |
Mark Moncarr
|
|
|
Not sure why there wasn’t a final on this Phone #: ###-#### Inspection requested via web by BRAD BAKER Ok final. Verified panel labeling. A/C correct brkr size and wire.
|
ELE-Aging Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 | | DONE |
Mark Moncarr
|
|
|
Schedule a final inspection
|
Permanent Service | 5/12/2014 | 5/13/2014 | 5/13/2014 | P | PASS |
Bob Reichert
|
|
|
Rough-in inspection of trenched conduit run. Contact on site is Jesse Simpson. Phone #: ###-#### >> Inspection requested via web by Matthew Dunay ok cover u/g only
|