Final | 7/23/2014 | 7/23/2014 | 7/23/2014 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by kevin blackmon correction done, final ok
|
Final | 7/22/2014 | 7/23/2014 | 7/23/2014 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by kevin blackmon NEC 210.4(B) Multiwire branch circuits(common trip) NEC408.41 One neutral per terminal lug
|
Final | 5/13/2014 | 5/14/2014 | 5/14/2014 | A | NR |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by kevin blackmon not ready for final at this time
|
Rough-In Permanent Service | 5/14/2014 | 5/14/2014 | 5/14/2014 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by kevin blackmon Rough-in p/s u/g n ok
|