Final | 12/12/2014 | 12/15/2014 | 12/15/2014 | A | PASS |
Rex Boyles
|
|
|
Mark Phone #: ###-#### as per conversation with Mark grounding grid with irreversable crimps (no tarmack access) final ok
|
Electrical Rough-In | 6/2/2014 | 6/3/2014 | 6/3/2014 | A | PASS |
Rock A. Hudson
|
|
|
Sid-Under-ground inspection please-Enter in off Orchard at gate 500-would like inspection before 10:00 Phone #: ###-#### RDR phase 1, 4 sign bases rough in ok cover
|