Final | 8/10/2014 | 8/11/2014 | 8/11/2014 | A | PASS |
Daryl DeGrange
|
|
|
Will be ready after 9:30. Just need to test and mark panel Phone #: ###-#### Inspection requested via web by Jerry Moore Shelving next to service panel removed at time of final, final ok
|
Rough-In Permanent Service | 8/5/2014 | 8/6/2014 | 8/6/2014 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Jerry Moore p/s u/g n ok
|
Permanent Service | 7/28/2014 | 7/29/2014 | 7/29/2014 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jerry Moore NEC 110.26 Working space for service panel, min. 30 in. wide is required.
|
Electrical Rough-In | 7/1/2014 | 7/2/2014 | 7/2/2014 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jerry Moore rough-in ok cover walls only Two runs of 3/4 FMC need pull boxes installed before ceiling inspection
|
Electrical Rough-In | 6/24/2014 | 6/24/2014 | 6/24/2014 | A | PASS |
Rock A. Hudson
|
|
|
Need parking lot pole base inspection for three locations Phone #: ###-#### >> Inspection requested via web by Jerry Moore 3 pole bases rough in ok cover
|
Electrical Rough-In | 5/20/2014 | 5/21/2014 | 5/21/2014 | P | PASS |
Rock A. Hudson
|
|
|
ELE-INSPECTOR Underground to pole bases rough in ok cover
|