Final | 5/8/2017 | 5/8/2017 | 5/8/2017 | P | PASS |
Rock A. Hudson
|
|
|
All temp power equipment rmoved. Final ok
|
Electrical Rough-In | 11/25/2014 | 11/25/2014 | 11/25/2014 | P | PASS |
Rex Boyles
|
|
|
Inspect underground raceways and aknowledge lightning protection ground loop. Phone #: ###-#### Inspection requested via web by Tom Betty r/i u.ground annex 12.5 kva 5 " primary and lightning protection grid to mass footing area and to the east ok to cover
|
Electrical Rough-In | 11/20/2014 | 11/21/2014 | 11/21/2014 | A | PASS |
Rex Boyles
|
|
|
Underground conduit Phone #: ###-#### Inspection requested via web by Tom Betty u.ground conduits to sewage lift and sump pumps ok n.west corner
|
Electrical Rough-In | 11/3/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Rex Boyles
|
|
|
Underground raceways and grounding Northside of project. Tom Hartung Foreman contact. Phone #: ###-#### Inspection requested via web by Tom Betty grounding grid and electrodes and u.ground for main electrical rooms ok
|
Final | 10/24/2014 | 10/27/2014 | 10/27/2014 | A | CANC |
Rex Boyles
|
|
|
Underground rough in southwest corner of site. Tom is your man. Phone #: ###-#### Inspection requested via web by Tom Betty needed r/i insp
|
Electrical Rough-In | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | PART |
Rex Boyles
|
|
|
Underground rough in southwest corner of site. Tom is your man. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok partial u.ground insp. for 12.5k volt feed north side of project
|
Electrical Rough-In | 10/20/2014 | 10/21/2014 | 10/21/2014 | A | PASS |
Rex Boyles
|
|
|
Ground ring inspection. Phone #: ###-#### Inspection requested via web by Tom Betty Annex bldg. grounding electrode from footing parrellel with Front street ok to cover
|
Conference | 8/5/2014 | 8/5/2014 | 8/5/2014 | P | DONE |
Rex Boyles
|
|
|
Look at existing in slab raceways prior contractor installed. We are contracted to take over scope of work. Phone #: ###-#### Inspection requested via web by Tom Betty contractor to refeed u.ground conduits to n.east sewer ejection pump pits due to inadequate depth of previosly installed conduits
|
Temporary Service | 6/30/2014 | 6/30/2014 | 6/30/2014 | P | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Tom Betty See permenant service notes
|
Permanent Service | 6/30/2014 | 6/30/2014 | 6/30/2014 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Tom Betty Service locations N.E and N.W. are temporary for cranes during construction which may last more than a year. Gear used for these services will be relocated to permenant location at later date. 2000 and 1600 amp mains will be field tested when in permenant locations. p/s u/g n ok
|
Electrical Rough-In | 6/20/2014 | 6/23/2014 | 6/23/2014 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Tom Betty u.g. duct bank continuation to Simplot bldg. sw.gear
|
Electrical Rough-In | 6/17/2014 | 6/17/2014 | 6/17/2014 | P | PASS |
Rex Boyles
|
|
|
Underground duct bank inspection Phone #: ###-#### >> Inspection requested via web by Tom Betty u.g. "shall better" enclosure area ok to cover
|
Electrical Rough-In | 6/5/2014 | 6/6/2014 | 6/6/2014 | P | PASS |
Rock A. Hudson
|
|
|
Underground duct bank Phone #: ###-#### >> Inspection requested via web by Tom Betty As noted on contractors print rough in ok cover
|