Final | 8/5/2014 | 8/5/2014 | 8/5/2014 | P | PASS |
Rex Boyles
|
|
|
Robert Phone #: ###-#### Inspection requested via web by Sean DeLacy ESPN Potato Bowl final ok
|
Electrical Rough-In | 7/24/2014 | 7/25/2014 | 7/25/2014 | A | PASS |
Rex Boyles
|
|
|
Robert. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ceilings ok ESPN Potato
|
Electrical Rough-In | 7/8/2014 | 7/9/2014 | 7/9/2014 | A | PASS |
Rex Boyles
|
|
|
Robert. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy r/i ceilings espn area ok except for corridor
|
Electrical Rough-In | 6/2/2014 | 6/2/2014 | 6/2/2014 | P | PASS |
Rex Boyles
|
|
|
Robert. Wall cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough in walls ok 3rd floor "ESPN Potato " space.
|