Final | 11/25/2014 | 11/26/2014 | 11/26/2014 | A | PASS |
Cevyn Recla
|
|
|
Please call to make sure someone is home. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown Final OK
|
Electrical Rough-In | 7/25/2014 | 7/25/2014 | 7/25/2014 | A | PASS |
Rex Boyles
|
|
|
Floor heat insp upstairs bathroom. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown r/i ok floor heat
|
Electrical Rough-In | 6/6/2014 | 6/9/2014 | 6/9/2014 | A | PASS |
Rex Boyles
|
|
|
master bed and bath. New upstairs bed, bath and bonus room. Phone #: ###-#### >> Inspection requested via web by Eric Brown rough in ok upst. and dnst.
|