Final | 12/15/2014 | 12/16/2014 | 12/16/2014 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot As per Daryl DeGrange 4-05-33(E)- Field evaluation shall be permitted by Professional Engineers. Final ok
|
Final | 10/30/2014 | 10/31/2014 | 10/31/2014 | A | NR |
Daryl DeGrange
|
|
|
Please call Doug at ###-#### before you head there so that he can meet you. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Not ready for final at this time. Review P.E application.
|
Electrical Rough-In | 10/31/2014 | 10/31/2014 | 10/31/2014 | A | PASS |
Daryl DeGrange
|
|
|
Please call Doug at ###-#### before you head there so that he can meet you. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Rough-in ok Electrical connections of equipment
|
Conference | 6/3/2014 | 6/3/2014 | 6/3/2014 | P | DONE |
Daryl DeGrange
|
|
|
Please call Doug on the way there. ###-#### Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot Discuss with Elect. contractor Fire sprinkler pipe above dedicated electrical space for service panels, but would require drip gutter for service gear protection.
|