Final | 8/7/2014 | 8/7/2014 | 8/7/2014 | A | PASS |
Rex Boyles
|
|
|
Inspection requested via web by Terry Scott final ok
|
Electrical Rough-In | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Bob Reichert
|
|
|
Rough-in Inspection for bath floor heat. Please call Ed 1/2 hr prior to inspection for access. ###-#### >> Inspection requested via web by Terry Scott ok cover floor heat
|
Electrical Rough-In | 6/11/2014 | 6/13/2014 | 6/13/2014 | A | PASS |
Bob Reichert
|
|
|
For access please call Ed 1/2 hr prior to inspection. ###-#### >> Inspection requested via web by Terry Scott bath ri ok
|