Final | 7/29/2014 | 7/29/2014 | 7/29/2014 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Alan Lusk final ok
|
Electrical Rough-In | 7/18/2014 | 7/18/2014 | 7/18/2014 | P | PASS |
Daryl DeGrange
|
|
|
Need 2nd grid ceiling inspection. Phone #: ###-#### >> Inspection requested via web by Alan Lusk Rough-in ok cover ceiling grid in rms 102 thur 120
|
Electrical Rough-In | 7/16/2014 | 7/16/2014 | 7/16/2014 | P | PASS |
Daryl DeGrange
|
|
|
Need rough in inspection for grid ceiling in main room Phone #: ###-#### >> Inspection requested via web by Alan Lusk rough-in ok cover ceiing grid in main office area only
|
Electrical Rough-In | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Alan Lusk rough-in ok cover walls
|