Final | 12/30/2014 | 12/30/2014 | 12/30/2014 | P | PASS |
Cevyn Recla
|
|
|
Shane is the contact his cell no. is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates no equipment in procedure room 116 and no sign, will require new electrical permit at installation. Final OK
|
Final | 12/30/2014 | 12/30/2014 | 12/30/2014 | A | CANC |
Cevyn Recla
|
|
|
Shane is the contact his cell no. Is ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Final | 12/29/2014 | 12/29/2014 | 12/29/2014 | P | FAIL |
Cevyn Recla
|
|
|
Shane is the contact his cell no. ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates 517.18 B Patient bed location receptacles shall be listed hospital grade receptacles and shall be so identified 422.31 disconnecting means shall be provided for all permanently installed appliances 408.4 circuit shall be legibly identified 110.16 arc flash warning labels required for panelboards and switchgear
|
Electrical Rough-In | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | PART |
Rock A. Hudson
|
|
|
Ceiling inspection. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates #2 stairway grid rough in ok cover
|
Electrical Rough-In | 12/8/2014 | 12/9/2014 | 12/9/2014 | A | PASS |
Cevyn Recla
|
|
|
Mill work. Shane is the contact his cell no. ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Wiring inside desk areas, reception and recovery, ok to cover
|
Electrical Rough-In | 12/5/2014 | 12/5/2014 | 12/5/2014 | P | PASS |
Cevyn Recla
|
|
|
Shane is the contact his cell no. ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates Ceiling inspection, as noted on prints dated 12-5-14 OK to cover
|
Electrical Rough-In | 11/26/2014 | 11/26/2014 | 11/28/2014 | P | PASS |
Cevyn Recla
|
|
|
Ceiling inspection, Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Ceiling OK to cover, area as noted on prints dated 11-26-14
|
Electrical Rough-In | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | PASS |
Cevyn Recla
|
|
|
Stairwell rough in. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
South stairwell, ok to cover
|
Electrical Rough-In | 11/6/2014 | 11/6/2014 | 11/6/2014 | P | PASS |
Cevyn Recla
|
|
|
Partial ceiling, Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Ceiling OK to cover as noted on prints dated 11-6-14, 16 rooms
|
Electrical Rough-In | 11/5/2014 | 11/5/2014 | 11/5/2014 | P | CANC |
Cevyn Recla
|
|
|
final on several office areas ready to occupy , also rough-in to cover ceilings Shane is the contact on site ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates Contractor put inspection for wrong date.
|
Electrical Rough-In | 10/28/2014 | 10/28/2014 | 10/28/2014 | P | PASS |
Rex Boyles
|
|
|
Ceiling inspection west stairwell. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates r/i ceiling stairwell ok
|
Electrical Rough-In | 10/23/2014 | 10/23/2014 | 10/24/2014 | P | CANC |
Rex Boyles
|
|
|
Service inspection. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates needed p/s
|
Permanent Service | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Rex Boyles
|
|
|
Service inspection. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates p/s u/g n ok (meter pack)
|
Electrical Rough-In | 10/13/2014 | 10/14/2014 | 10/14/2014 | P | PART |
Bob Reichert
|
|
|
Underground inspection. Shane is the contact his cell no. ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates ok cer u/g generator to building
|
Electrical Rough-In | 10/10/2014 | 10/13/2014 | 10/13/2014 | A | PASS |
Rex Boyles
|
|
|
Underground inspection. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates partial u. ground r/i ok
|
Conference | 9/23/2014 | 9/24/2014 | 9/24/2014 | A | DONE |
Rex Boyles
|
|
|
Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates discuss routing of 2 spare raceways at sw. gear
|
Electrical Rough-In | 9/22/2014 | 9/23/2014 | 9/23/2014 | A | PASS |
Rex Boyles
|
|
|
Hard lid cover. Shane is the contact his cell is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates r/i exterior soffit can lights and all interior hardlids ok to cover
|
Electrical Rough-In | 9/12/2014 | 9/15/2014 | 9/15/2014 | P | PASS |
Rex Boyles
|
|
|
Partial ceiling inspection. Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates r/i ceilings partial ok
|
Final | 9/12/2014 | 9/15/2014 | 9/12/2014 | P | CANC |
Rex Boyles
|
|
|
Partial ceiling inspection. Shane is the contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 9/12/2014 | 9/15/2014 | 9/12/2014 | P | CANC |
Rex Boyles
|
|
|
Shane is the contact his cell is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 9/2/2014 | 9/3/2014 | 9/3/2014 | A | PASS |
Rex Boyles
|
|
|
Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates r/i ok s.west stairwell and n.east wall in electrical room
|
Electrical Rough-In | 8/29/2014 | 9/2/2014 | 9/2/2014 | A | PASS |
Rex Boyles
|
|
|
Underground inspection. Shane is the contact his cell no. is ###-#### Phone #: ###-#### Inspection requested via web by Mike Basye r/i ok generator pad u.ground only
|
Electrical Rough-In | 8/26/2014 | 8/27/2014 | 8/27/2014 | P | PASS |
Rex Boyles
|
|
|
Walls, Shane is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Mike Basye r/i walls ok dentist office whole 1st floor
|
Electrical Rough-In | 6/27/2014 | 6/30/2014 | 6/30/2014 | A | PASS |
Rex Boyles
|
|
|
Underground. August is the contact his cell no. is ###-#### Phone #: ###-#### >> Inspection requested via web by Mike Basye r/i 100% whitewater slab ok to pour
|
Electrical Rough-In | 6/25/2014 | 6/25/2014 | 6/25/2014 | P | PASS |
Rex Boyles
|
|
|
Underground inspection. August is contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Mike Basye u.g. slab pvc only ok to cover
|
Electrical Rough-In | 6/18/2014 | 6/19/2014 | 6/19/2014 | A | PASS |
Rex Boyles
|
|
|
Underground, August is the contact his cell no. is ###-#### Phone #: ###-#### >> Inspection requested via web by Mike Basye u.g. electric room ok to cover
|