Final | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PASS |
Cevyn Recla
|
|
|
Phone #: ###-#### Inspection requested via web by Spencer McLean RTU's OK Final OK
|
Final | 11/4/2014 | 11/5/2014 | 11/5/2014 | P | PART |
Cevyn Recla
|
|
|
Phone #: ###-#### Inspection requested via web by Spencer McLean Temp occ OK, need to see HVAC systems, no access to rooftop, unsafe, and discuss water line with Daryl
|
Rough-In Permanent Service | 11/4/2014 | 11/5/2014 | 11/5/2014 | A | PASS |
Cevyn Recla
|
|
|
Please inspect the Service as we will have IPCO shut down the service in the AM for your inspection. Phone #: ###-#### Inspection requested via web by Spencer McLean PS, UG, N OK
|
Final | 10/27/2014 | 10/28/2014 | 10/28/2014 | A | FAIL |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Spencer McLean "power already on" but never requested perm. service. No water bond to service, never got to check grounding electrode conductor and not ready
|
Electrical Rough-In | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Rex Boyles
|
|
|
Ceiling inspection in bathrooms. Phone #: ###-#### Inspection requested via web by Spencer McLean r/i ok bathrooms and remainder of walls
|
Electrical Rough-In | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PASS |
Rex Boyles
|
|
|
Interior walls only Phone #: ###-#### Inspection requested via web by Spencer McLean r/i ok in all areas except clouded area,(one side ok there)
|
Electrical Rough-In | 7/10/2014 | 7/11/2014 | 7/10/2014 | A | PASS |
Rex Boyles
|
|
|
Please inspect underground for cover Phone #: ###-#### >> Inspection requested via web by Spencer McLean slab conduit ok to cover
|
Electrical Rough-In | 6/25/2014 | 6/25/2014 | 6/25/2014 | P | PASS |
Rex Boyles
|
|
|
Please inspect the feeder conduits for cover. Phone #: ###-#### >> Inspection requested via web by Spencer McLean u.g. rough in ok get ok from ID. POWER for secondary conduits
|