Final | 10/21/2014 | 10/22/2014 | 10/22/2014 | A | FAIL |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Surerus 210.8(3)(C)(1)-kitchen countertop receptacles shall be installed so that no point along the wall line is more than 24" measured horizontally froma receptacle outlet in that space. open ground in northwest bdrm. receptacles. Hood electrical not complete. 50% energy effiecient lamps required by energy code.
|
Final | 10/16/2014 | 10/17/2014 | 10/17/2014 | A | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Surerus called contractor, builder wrote down following: panel schedule in hall not correct, outlet in sitting room and outside porch not wired correctly, shall add outlet for wine cooler and kid's bath
|
Electrical Rough-In | 7/12/2014 | 7/14/2014 | 7/14/2014 | A | PASS |
Rex Boyles
|
|
|
>> Inspection requested via web by Dan Surerus r/i ok corrections made
|
Electrical Rough-In | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | FAIL |
Rex Boyles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Surerus 300.4(A) 11/4" to nearest edge of NM cable . need nailplates throughout remodel area
|