Final | 7/29/2014 | 7/29/2014 | 7/29/2014 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Matthew White final ok
|
Final | 7/23/2014 | 7/23/2014 | 7/23/2014 | P | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Matthew White called, shall provide red ipco labels, provide generator listing location, label breakers in panels, provide working clearance for disconnects on west side, and generator within 3' of gas meter
|
Conference | 7/2/2014 | 7/7/2014 | 7/7/2014 | A | PASS |
Daryl DeGrange
|
|
|
Matt Phone #: ###-#### Discussed with contractor, electrical requirements for Photovoltaic system. Battery and generator back-up.
|