Final | 7/9/2014 | 7/9/2014 | 7/9/2014 | P | PASS |
Rex Boyles
|
|
|
Before 3 please-Barbara-If not befor 3 please call to reschedule Phone #: ###-#### corrections made final ok
|
Conference | 7/3/2014 | 7/7/2014 | 7/7/2014 | A | CANC |
Rex Boyles
|
|
|
Barbara Phone #: ###-#### needed final
|
Final | 7/7/2014 | 7/7/2014 | 7/7/2014 | P | FAIL |
Rex Boyles
|
|
|
Barbara Phone #: ###-#### 210.8- Gfci protection required in kitchen counters, garage outlets and exterior outlets. Compeled panel schedule, install drywall above panel,
|