Final | 6/12/2015 | 6/12/2015 | 6/12/2015 | A | PASS |
Bob Reichert
|
|
|
Final inspection for IL area A ; B all rooms on all floors as balcony railings are finished and exterior lights and GFCI receptacles can be tested. Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok final, signed card
|
Final | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PART |
Bob Reichert
|
|
|
Final inspection IL stairwells A1, B1, B2. Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum part final as requested
|
Final | 6/4/2015 | 6/5/2015 | 6/5/2015 | P | PART |
Daryl DeGrange
|
|
|
Final inspection corridors and misc support rooms IL area A ; B 1st, 2nd, 3rd, and 4th floor rooms & Roof top units, Room B358. Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum Partial final ok
|
Final | 5/19/2015 | 5/19/2015 | 5/19/2015 | P | PART |
Bob Reichert
|
|
|
Final inspections IL area A ; B 1st floor rooms A102, B104, B109. Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok except outdoor receptacles
|
Final | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | PART |
Bob Reichert
|
|
|
Final inspection IL 2nd floor area A ; B rooms A201, A202, B201-B207, ; B209. Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok final except for balconies
|
Final | 5/14/2015 | 5/14/2015 | 5/14/2015 | A | PART |
Bob Reichert
|
|
|
Final inspection IL 3rd floor area B rooms B300-B307 ; B309.Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok final except balconies
|
Final | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | PART |
Bob Reichert
|
|
|
Final inspection IL 3rd floor area B rooms B300-B307 ; B309.Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok except balconies
|
Final | 5/12/2015 | 5/12/2015 | 5/12/2015 | P | PART |
Bob Reichert
|
|
|
Final inspection IL 4th floor area B rooms B401, B403, B404, B405, B406, B407, B409. Building permit number BLD13-00184. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok except for outdoor receptacles on patios
|
Final | 5/7/2015 | 5/7/2015 | 5/7/2015 | P | PART |
Bob Reichert
|
|
|
Final inspection IL 1st floor area B room B107. Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok final
|
Final | 5/5/2015 | 5/6/2015 | 5/6/2015 | A | PART |
Bob Reichert
|
|
|
Final inspection IL area B 1st floor rooms B101 ; B105. Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum 2 rooms ok final
|
Final | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PART |
Daryl DeGrange
|
|
|
Final inspection IL area B 1st floor rooms B103 ; B106. Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum partial final
|
Final | 4/28/2015 | 4/28/2015 | 4/28/2015 | P | PART |
Bob Reichert
|
|
|
Final IL area B 1st floor room B102. Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum room ok final
|
Final | 4/27/2015 | 4/27/2015 | 4/27/2015 | P | PART |
Bob Reichert
|
|
|
Final IL 1st floor area A and B rooms A101 and B100. Start of final inspections for IL apartments. Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum 2 rooms ok final, will check hood disconnect
|
Electrical Rough-In | 4/22/2015 | 4/23/2015 | 4/23/2015 | A | PASS |
Bob Reichert
|
|
|
Rough in T grid ceiling inspection IL 1st and 2nd floors area A ; B Corridors A151, B151, B152, A251, B251, ; B252. Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover as requested
|
Electrical Rough-In | 3/23/2015 | 3/24/2015 | 3/24/2015 | A | PASS |
Bob Reichert
|
|
|
Rough-in ceiling inspection for Corridor B351, B352, ; B451 T grid. Building permit number BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover ceiling as requested
|
Electrical Rough-In | 3/12/2015 | 3/13/2015 | 3/13/2015 | P | PASS |
Bob Reichert
|
|
|
Rough-in inspection IL area E 2nd floor soffits rooms E201-E206, E208, and E210. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover as requested
|
Electrical Rough-In | 3/10/2015 | 3/10/2015 | 3/10/2015 | A | PASS |
Bob Reichert
|
|
|
Rough-in inspection IL area A and B 1st floor hard lid corridor and misc rooms A151, B151, B153, B155, B156, and B157. Building permit BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover as requested
|
Electrical Rough-In | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Daryl DeGrange
|
|
|
Rough-in inspection IL area ''A'' ; ''B'' 2nd floor hard lid ceilings rooms: A251, B251, B252, B253, B255, B256, B257, ; B258. Building permit # BLD13-00182. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum rough-in ok cover as per areas listed
|
Electrical Rough-In | 1/14/2015 | 1/15/2015 | 1/15/2015 | P | PASS |
Daryl DeGrange
|
|
|
Rough-in hard lid inspection for IL area ''B'' 3rd floor rooms:B351, B352, B353, B355, B356, B357 and ''B'' 4th floor rooms:B451, B452, B453, B455, B456, ; B457. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum rough-in ok cover as per listed
|
Electrical Rough-In | 12/24/2014 | 12/29/2014 | 12/29/2014 | P | PASS |
Bob Reichert
|
|
|
Rough-in inspection soffits IL 1st floor area "A" rooms: A101 ; A102. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover as requested
|
Electrical Rough-In | 12/24/2014 | 12/24/2014 | 12/24/2014 | P | CANC |
Bob Reichert
|
|
|
Rough-in soffits IL 1st floor area "A" rooms: A101 & A102. Call Lonny when on site. Thanks. Phone #: ###-#### >> Inspection requested via web by Lonny Baum Inspection cancelled from web by: Lonny Baum
|
Electrical Rough-In | 12/23/2014 | 12/24/2014 | 12/24/2014 | A | PASS |
Bob Reichert
|
|
|
Rough-in soffits IL 1st floor area "B" rooms: B100-B107 ; B109. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover as requested
|
Electrical Rough-In | 12/9/2014 | 12/10/2014 | 12/10/2014 | A | PASS |
Bob Reichert
|
|
|
Rough-in ceiling soffits in IL building 2nd floor area "A" rooms: A201 ; A202. Call Lonny when on-site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover soffits as requested
|
Electrical Rough-In | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | PASS |
Bob Reichert
|
|
|
Rough-in ceiling soffit inspection for IL 2nd floor area "B" rooms: B200, B201, B202, B203, B204, B205, B206, B207, ; B209. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ceiling soffits ok cover as requested
|
Electrical Rough-In | 11/21/2014 | 11/24/2014 | 11/24/2014 | A | PASS |
Bob Reichert
|
|
|
Rough-in ceiling soffits IL area "B" rooms: B300 ; B302. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover soffits as requested
|
Electrical Rough-In | 11/17/2014 | 11/17/2014 | 11/17/2014 | P | PASS |
Bob Reichert
|
|
|
Electrical rough-in for soffits in IL area "B" 3rd floor rooms: B301, B303, B304, B305, B306, B307, ; B309. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover soffits as requested
|
Electrical Rough-In | 11/7/2014 | 11/10/2014 | 11/10/2014 | P | PASS |
Bob Reichert
|
|
|
Electrical rough-in for soffits in IL 4th floor rooms: B401, B403, B404, B405, B406, B407, ; B409. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum added room A-152 electrical room walls as well as rooms requested here, ok cover walls
|
Electrical Rough-In | 10/28/2014 | 10/29/2014 | 10/29/2014 | A | PASS |
Bob Reichert
|
|
|
Rough-in inspection for area "A" ; "B" IL misc support rooms: B153, B155, B156, B157, and stairwells "A", "B1", ; "B2". When on site call Lonny. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover as requested
|
Electrical Rough-In | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | PASS |
Bob Reichert
|
|
|
Rough-in inspection for IL rooms:B101, B103, B104, B105, B106, B107, B109, corridors B151, B152, and mechanical room B158. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ri ok as requested
|
Electrical Rough-In | 10/23/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Bob Reichert
|
|
|
Electrical rough-in for IL 1st floor rooms: A101, A102, B100, B102, ; A151 Corridor. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ri ok as noted
|
Electrical Rough-In | 10/9/2014 | 10/10/2014 | 10/10/2014 | A | PART |
Bob Reichert
|
|
|
Electrical rough-in inspection for IL building 2nd floor area A ; B rooms A201, A202, B200, B201, B202, B204, Corridors A251, B251, ; B252. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ri ok for rooms and hall listed, left correction notice for 2 rooms, NEC 110.26(F)(a),(b), there shall be no foreign systems in dedicated space for room 209, 122 in service pantry, commons
|
Electrical Rough-In | 10/8/2014 | 10/9/2014 | 10/9/2014 | A | PASS |
Bob Reichert
|
|
|
Electrical rough-in IL building 2nd floor area "B" rooms B203, B205, B206, B207, ; B209. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover rooms as requested
|
Electrical Rough-In | 9/25/2014 | 9/26/2014 | 9/26/2014 | A | PASS |
Rock A. Hudson
|
|
|
Rough-in inspection for room B307 and Corridors B351 ; B352. Call Lonny when on site to escort to inspection area. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum Noticed in kitchen boxes with more than one circuit all equiptment grounding conductors not bonded together. Areas noted rough in ok cover
|
Electrical Rough-In | 9/24/2014 | 9/25/2014 | 9/25/2014 | P | PART |
Rock A. Hudson
|
|
|
Need rough-in inspection for IL building 3rd floor rooms: B300, B301, B302, B303, B304, B305, B306, B307, ; B309. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum 307 not ready, 300 thru 306 and 309 rough in ok cover
|
Electrical Rough-In | 9/18/2014 | 9/19/2014 | 9/19/2014 | P | PASS |
Bob Reichert
|
|
|
Rough-in inspection for IL area "B" 4th floor rooms: B401, B403, B404, B405, B406, B407, B409, ; Corridor B451. Call Fabian when on-site ###-####, if no answer call Lonny ###-####. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ri ok as called for
|