Final | 6/1/2015 | 6/2/2015 | 6/2/2015 | A | PASS |
Rex Boyles
|
|
|
Trell Phone #: ###-#### corrections made final ok
|
ELE-Request for Extension | 5/28/2015 | 5/29/2015 | 5/29/2015 | A | DONE |
Rex Boyles
|
|
|
Trell-needs extension for a couple weeks to finish project and get final. If you need to go to jobsite and do inspection please call to meet Phone #: ###-#### no inspection needed at this time
|
Electrical Rough-In | 8/18/2014 | 8/19/2014 | 8/19/2014 | A | PASS |
Rock A. Hudson
|
|
|
call before // Kiersten Phone #: ###-#### Rough in ok cover
|
Electrical Rough-In | 8/15/2014 | 8/18/2014 | 8/18/2014 | P | FAIL |
Rock A. Hudson
|
|
|
late as possible//call 20 min prior to meet // Kiersten Whitehead Phone #: ###-#### Make up cover all cans and fans. Run 12-3 between smoke detectors
|
Conference | 7/22/2014 | 7/23/2014 | 7/23/2014 | P | DONE |
Rock A. Hudson
|
|
|
As late as possible please and call at least 30 mins prior to inspection-Kirsten Phone #: ###-#### Discussed code requirements for remodel of bed, bath, hall and family room. outlet lay out, dedicated bath outlet circuit, securing and support of NM cables
|
Conference | 7/22/2014 | 7/23/2014 | 7/22/2014 | A | CANC |
Doug A Poedy
|
|
|
As late as possible please and call at least 30 mins prior to inspection-Kirsten Phone #: ###-####. Supposed to be pm
|
Conference | 7/21/2014 | 7/22/2014 | 7/22/2014 | P | CANC |
Doug A Poedy
|
|
|
As late as possible please and call at least 30 mins prior to inspection-Kirsten Phone #: ###-####. Rescheduled
|