Final | 7/24/2014 | 7/25/2014 | 7/25/2014 | A | PASS |
Daryl DeGrange
|
|
|
Jesse Phone #: ###-#### final ok
|
Permanent Service | 7/23/2014 | 7/23/2014 | 7/23/2014 | P | PASS |
Daryl DeGrange
|
|
|
Kevin Phone #: ###-#### p/s u/g rec ok connection of photovoltaic equipment
|
Rough-In Permanent Service | 7/17/2014 | 7/18/2014 | 7/18/2014 | A | FAIL |
Daryl DeGrange
|
|
|
Call ahead for access, looking for 9:30ish inspection - Kevin Phone #: ###-#### Complete grounding connections NEC 230.6(5) shall not route unfused conductor along inside of walls of a building.
|