Final | 7/21/2014 | 7/23/2014 | 7/23/2014 | A | PASS |
Daryl DeGrange
|
|
|
Replaced wire between well head and pump controls in the crawl space. Phone #: ###-#### >> Inspection requested via web by Dan Mitchell final ok
|
Electrical Rough-In | 7/21/2014 | 7/23/2014 | 7/23/2014 | A | PASS |
Daryl DeGrange
|
|
|
Replaced wire between well head and pump controls in the crawl space. Phone #: ###-#### >> Inspection requested via web by Dan Mitchell rough-in ok
|