Final | 10/6/2014 | 10/7/2014 | 10/7/2014 | P | PASS |
Rex Boyles
|
|
|
Call for access if locked. Thanks Phone #: ###-#### Inspection requested via web by Clay Morgan final ok
|
Electrical Rough-In | 8/21/2014 | 8/22/2014 | 8/22/2014 | P | PASS |
Doug A Poedy
|
|
|
please call before-Zack Phone #: ###-####. Ok to cover.
|
Permanent Service | 8/22/2014 | 8/22/2014 | 8/22/2014 | P | PASS |
Doug A Poedy
|
|
|
please call before-Zack Phone #: ###-####. P/S Connect ok.
|
Electrical Rough-In | 8/21/2014 | 8/21/2014 | 8/21/2014 | P | FAIL |
Doug A Poedy
|
|
|
request 1pm // rex Phone #: ###-####. Not ready. needs nail plates, Can not use sheetrock screws for box grounds. All must be complete before reinspection.
|