Final | 5/4/2015 | 5/5/2015 | 5/5/2015 | P | PASS |
Rex Boyles
|
|
|
Lesley Phone #: ###-#### final ok
|
Electrical Rough-In | 8/28/2014 | 8/29/2014 | 8/29/2014 | A | PASS |
Rex Boyles
|
|
|
Mike Phone #: ###-#### corrections made r/i ok
|
Electrical Rough-In | 8/28/2014 | 8/28/2014 | 8/28/2014 | P | NH |
Bob Reichert
|
|
|
Mike Phone #: ###-#### called, phone doesn't work, left card'
|
Electrical Rough-In | 8/25/2014 | 8/25/2014 | 8/25/2014 | P | FAIL |
Daryl DeGrange
|
|
|
please call before/ after 3pm-Mike Phone #: ###-#### Remove baseboard heater and laundry receptacle circuits off bathroom receptacle circuit. Pigtail grounding conductors per device.Finish stapling nm cable within 12.in of boxes
|
Conference | 8/8/2014 | 8/11/2014 | 8/11/2014 | P | DONE |
Rock A. Hudson
|
|
|
MikePlease call prior to inspection and as late as possible please Phone #: ###-#### Discussed minimum recepticals outlets required for habitable rooms, dedicated circuit for receptical located in bathroom, and NM cable support and secure codes.
|
Conference | 8/1/2014 | 8/4/2014 | 8/4/2014 | P | NH |
Rock A. Hudson
|
|
|
Please call ahead for access - MIke Phone #: ###-#### Left card
|