Final | 6/18/2015 | 6/19/2015 | 6/19/2015 | A | PASS |
Rock A. Hudson
|
|
|
We were waiting on air conditioner so it''s ready. Call Daniel ###-#### if you have any questions. Someone will be there for access Phone #: ###-#### Inspection requested via web by daniel bibikov No card posted. Final ok
|
Final | 10/10/2014 | 10/13/2014 | 10/13/2014 | A | PART |
Rock A. Hudson
|
|
|
Call Erin half hour prior for access at ###-#### Thank you Phone #: ###-#### Inspection requested via web by daniel bibikov Partial final to ensure removable panel for insta-hot in bathroom and nail plates bored holes that do not maintain 1 1/4" from framing surface. Office space ok occupy.
|
Final | 9/30/2014 | 9/30/2014 | 9/30/2014 | P | NH |
Daryl DeGrange
|
|
|
Someone should be there for access if not call Me ###-####. Thank you Phone #: ###-#### Inspection requested via web by daniel bibikov No access, no answer from contact person, Non-terminated 12/3 MC cable on west side of building near future gas meter location.
|
Electrical Rough-In | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov rough-in ok cover
|