Final | 11/25/2014 | 11/28/2014 | 11/28/2014 | A | PASS |
Cevyn Recla
|
|
|
Tim Phone #: ###-#### Final OK
|
Final | 11/21/2014 | 11/24/2014 | 11/24/2014 | A | CANC |
Rock A. Hudson
|
|
|
Timothy Phone #: ###-#### Home owner not available will reschedule
|
Electrical Rough-In | 9/30/2014 | 10/3/2014 | 10/3/2014 | A | PASS |
Rock A. Hudson
|
|
|
Timothy Phone #: ###-#### Shed rough in ok cover
|
Permanent Service | 10/3/2014 | 10/3/2014 | 10/3/2014 | P | PASS |
Rock A. Hudson
|
|
|
Timothy Phone #: ###-#### p/s o/h n ok
|
Electrical Rough-In | 9/24/2014 | 9/26/2014 | 9/26/2014 | P | FAIL |
Rock A. Hudson
|
|
|
Tim Phone #: ###-#### Shall have min. 6" workable wire at each box. Box for 50 a receptical shall be of sufficient size. 300.4- Shall secure NM cable 1 1/4" from framing surface. Shall make up all boxes. Informed extra height of service mast Idaho Power may refuse ro connect
|
Conference | 8/7/2014 | 8/7/2014 | 8/7/2014 | P | DONE |
Rock A. Hudson
|
|
|
Terry Phone #: ###-#### Discussed code requirements for shop wiring, service grounding, service riser and entrance conductors.
|