Final | 9/30/2014 | 10/1/2014 | 10/1/2014 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Inspection requested via web by Celinda Winters ok final
|
Electrical Rough-In | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PASS |
Daryl DeGrange
|
|
|
Ceiling in the office Phone #: ###-#### Inspection requested via web by Celinda Winters rough-in ok cover ceiling grid
|
Electrical Rough-In | 9/21/2014 | 9/22/2014 | 9/22/2014 | A | PASS |
Daryl DeGrange
|
|
|
2nd floor new office ask for Cliff or Gill at the front desk they will show where it is located Phone #: ###-#### Inspection requested via web by Celinda Winters rough-in ok cover walls only
|
Electrical Rough-In | 9/19/2014 | 9/22/2014 | 9/21/2014 | A | CANC |
Bob Reichert
|
|
|
2nd floor. New office. Phone #: ###-#### >> Inspection requested via web by Celinda Winters Inspection cancelled from web by: Celinda Winters
|
Electrical Rough-In | 9/13/2014 | 9/15/2014 | 9/15/2014 | A | PASS |
Bob Reichert
|
|
|
2 offices/ copier room and conference room - please call Gill the General Contractor 20 minutes before inspection so he can meet you . Cell number ###-####.. Thank you. Phone #: ###-#### Inspection requested via web by Celinda Winters ri ok
|
Electrical Rough-In | 8/26/2014 | 8/27/2014 | 8/27/2014 | A | PASS |
Bob Reichert
|
|
|
Switch located at top of the elevator (turn to the west) needs inspected- Phone #: ###-#### >> Inspection requested via web by Celinda Winters ok cover switch by elevator, floor 2
|