Final | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PASS |
Daryl DeGrange
|
|
|
final on highbays Phone #: ###-#### Inspection requested via web by Tim Dunlop job complete, final ok
|
Electrical Rough-In | 8/28/2014 | 8/28/2014 | 8/28/2014 | A | PASS |
Daryl DeGrange
|
|
|
rough in on highbays Phone #: ###-#### Inspection requested via web by Tim Dunlop UL liste material, rough-in ok
|