Final | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | PASS |
Bob Reichert
|
|
|
Homeowner and electrician will be there at 12:30 to 1pm. To go over our scope of work. Thanks Phone #: ###-#### Inspection requested via web by Darryn Coburn ok final
|
Final | 5/22/2015 | 5/22/2015 | 5/26/2015 | P | CANC |
Rex Boyles
|
|
|
Any questions get ahold of Tony Young finaled out by Bob R.
|
Final | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | FAIL |
Rex Boyles
|
|
|
Shannon-homeowner is requesting final on all subs-she says work is done and needs bldg final as well-please call 30 minutes prior to meet Phone #: ###-#### GFCI for jetted tub needs to be accessable. Label garage panel. Please have Vic or someone who can show me where your work starts and stops.
|
Electrical Rough-In | 9/26/2014 | 9/26/2014 | 9/26/2014 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn r/i ok
|
Electrical Rough-In | 9/25/2014 | 9/25/2014 | 9/25/2014 | P | CANC |
Rex Boyles
|
|
|
remodel of garage and house Phone #: ###-#### Inspection requested via web by Darryn Coburn called in twice
|
Electrical Rough-In | 9/25/2014 | 9/25/2014 | 9/25/2014 | P | NR |
Rex Boyles
|
|
|
remodel of garage and house Phone #: ###-#### Inspection requested via web by Darryn Coburn no access to house. garage loadcenter requires separate grounding electrode. still need underground inspection for subfeed.
|
Permanent Service | 9/8/2014 | 9/8/2014 | 9/8/2014 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn p/s o/h rec ok will look for 2nd ground rod and water bond at r/i insp.
|