Final | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
James Ady
|
|
|
Call half hour before to meet // Mike Phone #: ###-#### Bonus room only final ok
|
Electrical Rough-In | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | PASS |
James Ady
|
|
|
Upstairs // Mike Phone #: ###-#### Bonus room area Above garage only Rough in ok
|
Electrical Rough-In | 9/24/2014 | 9/24/2014 | 9/24/2014 | P | PASS |
Bob Reichert
|
|
|
Mike-please call for access Phone #: ###-#### ri ok lower part only
|
Electrical Rough-In | 9/15/2014 | 9/17/2014 | 9/16/2014 | P | NR |
Bob Reichert
|
|
|
michael Phone #: ###-#### see conf
|
Conference | 9/15/2014 | 9/17/2014 | 9/16/2014 | P | DONE |
Bob Reichert
|
|
|
michael Phone #: ###-#### talked about free length conductor, stapling, make-up, box fill,no devices shall be installed, bundling nm cable over panel, when to call for ri
|