Final | 5/21/2015 | 5/21/2015 | 5/21/2015 | P | PASS |
Rex Boyles
|
|
|
Inspection requested via web by Brandon Blackham final ok
|
Electrical Rough-In | 10/15/2014 | 10/17/2014 | 10/17/2014 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon Blackham Contractor stated NM calbe ran through floor will be behind 2 hour fire rated ceiling on lower level. Rough in ok cover
|
Electrical Rough-In | 10/15/2014 | 10/17/2014 | 10/15/2014 | A | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brandon Blackham Inspection cancelled from web by: Brandon Blackham
|
Permanent Service | 9/18/2014 | 9/19/2014 | 9/19/2014 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon Blackham p/s o/h n ok 1 meter
|