Final | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | PASS |
Bob Reichert
|
|
|
Jon Fivecoat is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce ok final
|
Final | 3/17/2015 | 3/17/2015 | 3/19/2015 | P | FAIL |
Daryl DeGrange
|
|
|
Jon Fivecoat is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce NEC 110.3(B) Installation, Generator not installed with proper air flow clearances as per manufactures requirements
|
Electrical Rough-In | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PASS |
Cevyn Recla
|
|
|
Underground Inspection, Geoff Hannaford is contact ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce OK to cover underground 3- 3/4 and 1 2" PVC to be under min. 4 " concrete slab
|