Final | 4/3/2015 | 4/3/2015 | 4/3/2015 | P | PASS |
Bob Reichert
|
|
|
call prior to arrival for access Phone #: ###-#### Inspection requested via web by Patrick Paz ok final
|
Rough-In Permanent Service | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PASS |
Cevyn Recla
|
|
|
call prior to arrival for access. Phone #: ###-#### Inspection requested via web by Patrick Paz RI OK PS, OH, N OK
|
Conference | 9/25/2014 | 9/26/2014 | 9/26/2014 | A | DONE |
Rex Boyles
|
|
|
call for ETA please. Phone #: ###-#### Inspection requested via web by Patrick Paz discuss electrical to be replaced. Relocate service to fix working space issues and service drop clearance of 10 foot minimum from ground. Remove and replace knob and tube wiring at all exposed walls and ceilings. Remove conduit and wiring feeding kitchen and replace with new NM cable. Re wire bathroom to meet code. OK to refeed old wiring in rooms where no walls or ceilings are exposed if wiring is safe. Bring entire house up to NEC code with GFCI and AFCI protection.
|