Final | 1/23/2015 | 1/26/2015 | 1/26/2015 | P | PASS |
Cevyn Recla
|
|
|
Ceiling cover inspection and final inspection. Phone #: ###-#### Inspection requested via web by Steve McCloy Ceiling OK to cover in lobby, Final OK
|
Electrical Rough-In | 12/29/2014 | 12/30/2014 | 12/30/2014 | A | CANC |
Bob Reichert
|
|
|
Underground inspection in front lobby; (3) sawcuts ; floor boxes. Phone #: ###-#### Inspection requested via web by Steve McCloy see 4-29-14 inspection, this is duplicate request
|
Electrical Rough-In | 12/29/2014 | 12/29/2014 | 12/29/2014 | P | PASS |
Cevyn Recla
|
|
|
Underground inspection; (3) sawcuts Phone #: ###-#### Inspection requested via web by Steve McCloy UG conduit ok to cover
|
Electrical Rough-In | 12/22/2014 | 12/22/2014 | 12/22/2014 | P | PASS |
Rex Boyles
|
|
|
Call when in route if possible. Thanks. Phone #: ###-#### Inspection requested via web by Steve McCloy r/i walls ok new entrance
|
Electrical Rough-In | 11/19/2014 | 11/20/2014 | 11/20/2014 | A | PASS |
Cevyn Recla
|
|
|
Call when in route if possible. Sign in with security desk for visitors badge. Phone #: ###-#### Inspection requested via web by Steve McCloy ceiling inspection, ok to cover large security office, 2 smaller securtiy office rooms Break area has fixture whip installed, and seismic wires in, no grid installed. This area will have 3 recessed cans, contractor to call for inspection when grid is in, and cans installed, but tiles still open to make cans viewable.
|
Electrical Rough-In | 10/22/2014 | 10/23/2014 | 10/23/2014 | A | PASS |
Bob Reichert
|
|
|
Check in with security at front desk to sign in and receive a visitors pass. Call when in route if possible. Phone #: ###-#### Inspection requested via web by Steve McCloy bathroom and office walls only ok cover
|