Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberELE14-02803
StatusFinaled
Name TRI STATE ELECTRIC
Site Address 712 N 8TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Electrical Permit - Alteration: Electrical for 1st floor unit #2 tenant improvement
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/21/20151/21/20151/21/2015PPASS
DetailsCevyn Recla
corrections made, Final OK
Final1/20/20151/21/20151/21/2015AFAIL
DetailsCevyn Recla
Final inspection please Contact name is Travis Funk Thank you Phone #: ###-#### Inspection requested via web by Deb Gooden
210.8 GFI protection required all kitchen countertops receptacle
408.4 circuit identification required
334.12 B.4 NM not permitted wet or damp locations
330.12 MC cable not permitted wet or damp location without corrosive resistant jacktet
356.30 LFNC shall be secured within 12 inches of boxes.
left message on number provided
Final10/14/201410/14/201410/14/2014ACANC
DetailsRex Boyles
Contact: Scott Hofhine Phone #: ###-#### Inspection requested via web by Deb Gooden needed r/i
Electrical Rough-In10/14/201410/14/201410/14/2014PPASS
DetailsRex Boyles
Contact: Scott Hofhine Phone #: ###-#### Inspection requested via web by Deb Gooden grounding electrodes added. r/i ok inside unit#2. Look for separate permit for washer, dryer and heater circuits for unit#3 in same wall as unit#2
Permanent Service10/8/201410/9/201410/9/2014PPASS
DetailsRex Boyles
Contact: Scott Hofhine Phone #: ###-#### Inspection requested via web by Deb Gooden p/s o/h rec ok APT#2 look for supplamental ground rods at final