Temporary Service | 11/11/2014 | 11/12/2014 | 11/12/2014 | A | PASS |
Daryl DeGrange
|
|
|
Call Jimmy for questions @ ###-####, Tested load was 42 amps at peak. Phone #: ###-#### Inspection requested via web by John Edwards t/s ok
|
Conference | 11/7/2014 | 11/10/2014 | 11/10/2014 | A | DONE |
Rex Boyles
|
|
|
Call Jimmy to schedule @ ###-#### Phone #: ###-#### Inspection requested via web by John Edwards discuss temporary electrical to modular. reduce main breaker to 60 amp and feed with #4 so cord ok
|