Final | 1/16/2015 | 1/20/2015 | 1/20/2015 | A | PASS |
Daryl DeGrange
|
|
|
Jimmy Phone #: ###-#### RU Listed Partitions, final ok NO card on site
|
Temporary Service | 1/12/2015 | 1/13/2015 | 1/13/2015 | A | CANC |
Rock A. Hudson
|
|
|
Jimmy Phone #: ###-#### Needed final
|
Final | 1/13/2015 | 1/13/2015 | 1/13/2015 | P | PART |
Rock A. Hudson
|
|
|
Jimmy Phone #: ###-#### Shall call for final when cubicals are set. Contractor to install surface mounted electrical for cubicals. Temporary Final ok
|
Electrical Rough-In | 1/8/2015 | 1/9/2015 | 1/9/2015 | P | PASS |
Cevyn Recla
|
|
|
Jimmy-ceiling Phone #: ###-#### corrections made, abandoned cable removed, low volt cables tied off above grid, Ceiling OK to Cover
|
Final | 12/23/2014 | 12/23/2014 | 12/23/2014 | P | NR |
Bob Reichert
|
|
|
Jimmy Phone #: ###-#### re-visited bringing ceiling up to code, abandoned cable removal, fix heating and controls
|
Conference | 12/15/2014 | 12/16/2014 | 12/16/2014 | A | DONE |
Bob Reichert
|
|
|
Jimmy Phone #: ###-#### talked about cleaning up ceiling, left correction notice, BCC 4-05-32 no violations shall be retained, told can do t/o if furniture not there, but need to see completed job for final
|
Electrical Rough-In | 11/18/2014 | 11/18/2014 | 11/18/2014 | P | PASS |
Bob Reichert
|
|
|
Jimmy Phone #: ###-#### walls only ok cover, called to advise ceiling will have to get cleaned up
|