Final | 4/15/2015 | 4/15/2015 | 4/15/2015 | P | PASS |
Rex Boyles
|
|
|
General Contractor needs his card signed. Steve Mitchell ###-#### Phone #: ###-#### Inspection requested via web by Bryan Atkins final ok
|
Final | 3/16/2015 | 3/16/2015 | 3/16/2015 | P | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Atkins correction done, waiting for BLD approval
|
Final | 3/5/2015 | 3/5/2015 | 3/5/2015 | P | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Atkins called contractor and told him that updated panel schedules shall be provided, breaker blanks shall be installed, then call for final, Note: make sure BLD is not under review
|
Electrical Rough-In | 2/11/2015 | 2/12/2015 | 2/12/2015 | A | PASS |
Rex Boyles
|
|
|
Ceiling inspection Phone #: ###-#### Inspection requested via web by Bryan Atkins r/i t bar ceilings ok
|
Electrical Rough-In | 11/28/2014 | 11/28/2014 | 11/28/2014 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Atkins corrections made r/i ok
|
Electrical Rough-In | 11/24/2014 | 11/25/2014 | 11/25/2014 | A | NH |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Atkins no answer and no access
|