Final | 5/20/2015 | 5/21/2015 | 5/21/2015 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Lori Stout final ok
|
Rough-In Permanent Service | 2/17/2015 | 2/18/2015 | 2/18/2015 | P | PASS |
Rock A. Hudson
|
|
|
Please contact Dean for electrical questions at ###-#### or Mike at the office ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lori Stout Ceiling rough in ok cover p/s u/g n ok
|
Electrical Rough-In | 12/23/2014 | 12/24/2014 | 12/24/2014 | A | PASS |
Rock A. Hudson
|
|
|
Dean Phone #: ###-#### Underground around foot print of building rough in ok cover
|
Electrical Rough-In | 12/17/2014 | 12/23/2014 | 12/23/2014 | A | CANC |
Rock A. Hudson
|
|
|
Area outside of building footprints Phone #: ###-#### >> Inspection requested via web by Lori Stout Inspection cancelled from web by: Lori Stout
|
Electrical Rough-In | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | PASS |
Rock A. Hudson
|
|
|
Lower portion of the pump station Phone #: ###-#### Inspection requested via web by Lori Stout Lower floor pour and electrical room floor, 4/0 copper under ground to well casing. Rough in ok cover
|
Electrical Rough-In | 12/15/2014 | 12/16/2014 | 12/16/2014 | P | CANC |
Rock A. Hudson
|
|
|
Would we like to request a rough underground/conference inspection. Thank you The contact is Dean Hunsperger. Phone #: ###-#### Inspection requested via web by Lori Stout Conference only needed
|
Conference | 12/16/2014 | 12/16/2014 | 12/16/2014 | P | DONE |
Rock A. Hudson
|
|
|
Would we like to request a rough underground/conference inspection. Thank you The contact is Dean Hunsperger. Phone #: ###-#### Inspection requested via web by Lori Stout Discussed conduits passing through concrete wall chases provided. Concernwith bundling of conduits through wall. Seperation will be provided on each side of wall, tight area will be less than 2.' Minimal continuous loads. Heating due to bundling not an issue.
|
Electrical Rough-In | 11/21/2014 | 11/24/2014 | 11/24/2014 | A | PASS |
Cevyn Recla
|
|
|
ADDITIONAL CONTACT DEAN ###-#### Phone #: ###-#### Inspection requested via web by Lori Stout UFER ground inspection, ok to pour concrete
|