Final | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Daryl DeGrange
|
|
|
final ok
|
Final | 2/25/2015 | 2/25/2015 | 2/25/2015 | P | FAIL |
Rock A. Hudson
|
|
|
210.4- 3 phase multiwire branch circuit pulled on single phase service. 100 Multiwire branch circuits- All ungrounded conductor shall have voltage between them.
|
Final | 2/11/2015 | 2/11/2015 | 2/11/2015 | P | PASS |
Rock A. Hudson
|
|
|
Ryan Phone #: ###-#### Final ok
|
Electrical Rough-In | 12/30/2014 | 12/30/2014 | 12/30/2014 | P | PART |
Bob Reichert
|
|
|
Underground Inspection - Contact is Ryan Weidrich ###-#### Phone #: ###-#### Inspection requested via web by Scott Campbell u/g ne of shelter runnng diagonally to se ok cover
|
Electrical Rough-In | 12/17/2014 | 12/17/2014 | 12/17/2014 | P | PASS |
Rock A. Hudson
|
|
|
Ryan Phone #: ###-#### Underground from sidewalk to ground box at west picnic area rough in ok cover
|
Permanent Service | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | PASS |
Rock A. Hudson
|
|
|
Ryan Phone #: ###-#### Discussed under ground wiring for power to gazebos to south and southeast as well as power near dumpster coral. p/s u/g n ok
|
Electrical Rough-In | 12/10/2014 | 12/10/2014 | 12/10/2014 | P | PASS |
Cevyn Recla
|
|
|
Ryan-underground Phone #: ###-#### Underground ok to cover from Idaho Power pole to meter base
|