Final | 2/12/2015 | 2/12/2015 | 2/12/2015 | P | PASS |
Cevyn Recla
|
|
|
Tyler-please call to meet Phone #: ###-#### FINAL OK
|
Electrical Rough-In | 2/11/2015 | 2/12/2015 | 2/12/2015 | P | PASS |
Cevyn Recla
|
|
|
Tyler-please call to meet Phone #: ###-#### grounding installed, RI OK
|
Electrical Rough-In | 1/5/2015 | 1/6/2015 | 1/6/2015 | P | FAIL |
Cevyn Recla
|
|
|
Tyler// please call before Phone #: ###-#### met owner on site, need #6 grounding electrode conductor to panels, and down to grounding electrode, verify if supplemental grounding electrode is installed, or add second ground rod.
|
Conference | 11/28/2014 | 11/28/2014 | 11/28/2014 | P | DONE |
Cevyn Recla
|
|
|
Tyler Phone #: ###-#### Discussed requirements for PV system install. Using Enphase brand product, all listed materials.
|