Final | 1/5/2015 | 1/6/2015 | 1/6/2015 | A | PASS |
Daryl DeGrange
|
|
|
Final for re-inspection for GFI installed and access to outlets. Justin Metcalf is the contact. Thank you so much. Phone #: ###-#### Inspection requested via web by Laura Longshaw corrections done final ok
|
Final | 1/5/2015 | 1/5/2015 | 1/5/2015 | P | FAIL |
Rock A. Hudson
|
|
|
Final inspection for this property. Contact is Justin Metcalf. Thank you and have a good day. Phone #: ###-#### Inspection requested via web by Laura Longshaw 210.8-Ground fault circuit interupters shall be installed in a readily accessible location. 210.8(B)(5)- Receptical outlets located with in 6' of sink shall have GFCI protection. 400.8- Flexible cordd shall not be ran through holes in walls. BCC 4-05-32 Code violations not to be retained 314.29- Boxes shall be installed so that the wiring contained in them can be rendered accessible without removing any part of building.
|
Electrical Rough-In | 12/5/2014 | 12/8/2014 | 12/8/2014 | A | PASS |
Rock A. Hudson
|
|
|
This will be a rough-in inspection and your contact is Justin Metcalf. Please call ahead of arrival as he will not be on site. Thank you and have a great day! Phone #: ###-#### Inspection requested via web by Laura Longshaw Installed underground and surface mounted outlet on south wall. Under slab rough in ok cover
|