Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE14-03488
StatusFinaled
Name ENERGY ENTERPRISE GROUP LLC
Site Address 1666 W RIDENBAUGH ST
Project Name 
Customer Number578
ePlanReviewNo
Description
Electrical Permit - Alteration: Electrical for remodel of Fire Station
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/12/20156/12/20156/12/2015PPASS
DetailsRex Boyles
corrections on roof made and all receptacles in garage are GFCI protected now. final ok
Final6/11/20156/12/20156/12/2015ANR
DetailsDaryl DeGrange
Shawn Case Phone #: ###-#### Inspection requested via web by Kerri Hamilton Not ready at this time, will reschedule for PM inspection
Permanent Service5/26/20155/27/20155/27/2015APASS
DetailsRex Boyles
Phone #: ###-#### Inspection requested via web by Kerri Hamilton corrections made p/s u/g n ok
Permanent Service5/25/20155/26/20155/26/2015AFAIL
DetailsRex Boyles
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 250.68-Install nuetral disconnect link or bonding jumper for nuetral at main disconnect. 110.24- fault currents need to be labeled with date from Idaho Power on main disconnect. 110.16-arc flash warning label required on panels and main. Slip joint coupling required on secondary underground conduit with sch 80 conduit. Install bonding bushing at main disconnect.
Electrical Rough-In5/4/20155/4/20155/4/2015PPASS
DetailsDaryl DeGrange
Phone #: ###-#### Inspection requested via web by Kerri Hamilton rough-in ok cover service and communication underground
Electrical Rough-In4/30/20154/30/20154/30/2015PPASS
DetailsDaryl DeGrange
The GC is wanting to pour at 1 pm. Phone #: ###-#### Inspection requested via web by Kerri Hamilton rough-in ok cover underground to flag pole base (LED)
Electrical Rough-In3/17/20153/18/20153/18/2015PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Walls and hard lid rough in ok cover
Electrical Rough-In2/12/20152/12/20152/12/2015PPASS
DetailsCevyn Recla
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
ufer ground OK
2 conduits between East wall windows ok to cover
Electrical Rough-In2/9/20152/11/20152/11/2015PCANC
DetailsCevyn Recla
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
contractor called and cancelled
Electrical Rough-In2/5/20152/5/20152/5/2015PPASS
DetailsCevyn Recla
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
underground from east foundation wall across garage floor, 3 conduits, ok to cover