Final | 6/12/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Rex Boyles
|
|
|
corrections on roof made and all receptacles in garage are GFCI protected now. final ok
|
Final | 6/11/2015 | 6/12/2015 | 6/12/2015 | A | NR |
Daryl DeGrange
|
|
|
Shawn Case Phone #: ###-#### Inspection requested via web by Kerri Hamilton Not ready at this time, will reschedule for PM inspection
|
Permanent Service | 5/26/2015 | 5/27/2015 | 5/27/2015 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton corrections made p/s u/g n ok
|
Permanent Service | 5/25/2015 | 5/26/2015 | 5/26/2015 | A | FAIL |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 250.68-Install nuetral disconnect link or bonding jumper for nuetral at main disconnect. 110.24- fault currents need to be labeled with date from Idaho Power on main disconnect. 110.16-arc flash warning label required on panels and main. Slip joint coupling required on secondary underground conduit with sch 80 conduit. Install bonding bushing at main disconnect.
|
Electrical Rough-In | 5/4/2015 | 5/4/2015 | 5/4/2015 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton rough-in ok cover service and communication underground
|
Electrical Rough-In | 4/30/2015 | 4/30/2015 | 4/30/2015 | P | PASS |
Daryl DeGrange
|
|
|
The GC is wanting to pour at 1 pm. Phone #: ###-#### Inspection requested via web by Kerri Hamilton rough-in ok cover underground to flag pole base (LED)
|
Electrical Rough-In | 3/17/2015 | 3/18/2015 | 3/18/2015 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Walls and hard lid rough in ok cover
|
Electrical Rough-In | 2/12/2015 | 2/12/2015 | 2/12/2015 | P | PASS |
Cevyn Recla
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton ufer ground OK 2 conduits between East wall windows ok to cover
|
Electrical Rough-In | 2/9/2015 | 2/11/2015 | 2/11/2015 | P | CANC |
Cevyn Recla
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton contractor called and cancelled
|
Electrical Rough-In | 2/5/2015 | 2/5/2015 | 2/5/2015 | P | PASS |
Cevyn Recla
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton underground from east foundation wall across garage floor, 3 conduits, ok to cover
|