Final | 6/12/2015 | 6/15/2015 | 6/15/2015 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by kendall bender final ok
|
Final | 6/12/2015 | 6/12/2015 | 6/12/2015 | A | NR |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by kendall bender to many items to list not ready
|
Electrical Rough-In | 5/26/2015 | 5/27/2015 | 5/27/2015 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Inspection requested via web by kendall bender ok cover floor heat
|
Electrical Rough-In | 1/22/2015 | 1/22/2015 | 1/22/2015 | A | PASS |
Cevyn Recla
|
|
|
WUII fire domes over can lights Phone #: ###-#### Inspection requested via web by kendall bender Fire barrier installed for soffit cans, ok to cover
|
Rough-In Permanent Service | 1/2/2015 | 1/5/2015 | 1/5/2015 | A | PASS |
Cevyn Recla
|
|
|
corrections made, ok to cover interior only, no soffit cover allowed, WUI zone. PS, UG, N, OK
|
Electrical Rough-In | 1/2/2015 | 1/2/2015 | 1/2/2015 | P | NR |
Cevyn Recla
|
|
|
Phone #: ###-#### Inspection requested via web by kendall bender not ready, moved to monday
|
Electrical Rough-In | 12/31/2014 | 12/31/2014 | 12/31/2014 | A | FAIL |
Cevyn Recla
|
|
|
Phone #: ###-#### Inspection requested via web by kendall bender 334.30 nm cable shall be secured at intervals no greater than 4 1/2 feet 300.4.1 cable through bored holes shall have protection when hole is less than 1 1/4 inche from edge of framing member 300.4.D cable run parallele to framing member shall be supported so edge of cable is no less than 1 1/4 inch from edge of framing member 210.52 rececptacles shall be installed so that no wall space is greater than 6 foot from a receptacle 210.11 bathroom outlets shall be supplied by 20 amp circuit and supply no other loads. WUI Zone: soffit cans require 2 hour minimum fire barrier called contractor
|